Note for installation of medium frequency elbow machine
Note for installation of medium frequency elbow machine
1. The installation of the medium frequency elbow machine shall be provided by us with the basic drawing, and the buyer shall finish the basic making in advance.Second grouting shall be reserved at the location with anchor bolts. Party a shall prepare corresponding leveling pads on both sides of each anchor bolt.
2. Before installation of medium frequency elbow machine, the demander shall prepare the foundation and hydropower facilities in advance and meet the installation conditions.
3. The hydraulic station and pipelines of the medium frequency elbow machine shall be fixed after being installed, and hydraulic oil shall be injected into the oil tank of the hydraulic station. The oil level should be about 80% of the height of the box (the middle position of the oil mark is ok).